Asbestos Removal in Oregon City

Oregon City mixes newer neighborhoods with houses from before World War II, and the asbestos question depends on which one you own. We test, remove and clear houses for demolition, and we plan the job around the abatement report the city asks for.

Pre-1940 houses make up roughly a tenth of Oregon City’s homes. Add the 1940s through the 1970s, and the share built before 1980 reaches about 4 in 10.

Request a free quote
A 1950s bathroom mid-remodel with the tub wall cut away, floor tile lifted and plastic sheeting up

Our services

Teardowns

Survey, DEQ notice, abatement and the report the city wants before a demolition permit. Our pre-demolition abatement page explains the order.

Demolition permits in Oregon City

Look for the “Asbestos present” checkbox on Oregon City’s residential demolition form. The city won’t issue the permit until it has a copy of the DEQ asbestos abatement report, so abatement has to wrap up first.

Oregon lets cities ask for asbestos paperwork before demolition, and not every city does, so the rules can change from one city to the next.

Older and newer Oregon City houses

The city has a group of houses from 1939 or earlier, a 1970s group, and a large share built in the 1990s and 2000s. Homes built in 2004 or later fall outside the residential survey rule. Anything older needs the survey before a remodel or teardown, and a pre-war house can add plaster and old heating materials to the sampling list.

Older wood-sided house fenced off for demolition, with a plastic-lined dumpster, wet gravel and fir trees under a gray sky

Frequently asked questions

Can I remodel my own Oregon City house without a survey?

Owner-occupants renovating their own single-family house don’t need the survey, although DEQ still suggests getting one. Demolition cancels that exemption.

What if the contractor finds something unexpected?

Everything stops, the material stays wet under plastic, and a licensed crew takes over.

Who can remove cement siding?

Any contractor licensed with the Construction Contractors Board, after DEQ has the nonfriable notice and fee at least five days before work begins.

See asbestos removal in Wood Village, or start over on the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (971) 306-6033

Call (971) 306-6033